Monon Rail-Trail
check with the trail manager for updated details before visiting.
Monon Rail-Trail
City, Town, or County
Rail Trail
- Length
7.6 miles
- Elevation Gain
--
- Route Type
out & back
- Length
7.6 miles - Elevation Gain
-- - Route Type
out & back
The Monon Rail-Trail, one of Indiana's first State rail-trails, runs eight miles through Indianapolis.
Iron Bridge over Fall Creek River on Monon Trail. Photo by Connie Szabo Schmucker
Arches frame the Monon Trail as it crosses Fall Creek Parkway heading toward 38th Street Bridge. Photo by Connie Szabo Schmucker
Location: Indianapolis, IN
- States: Indiana
- Counties: Marion
The Monon Trail is a linear rail trail that spans Marion County to Hamilton County. The trail begins at 10th Street in Indianapolis extending North through Marion County into Hamilton County. The trail passes by commercial and industrial areas and then crosses the Fall Creek Trail just before the Indiana State Fairgrounds. Once you pass the fairgrounds you'll see the Indiana School for the Deaf to the North and East of the trail.
This is the beginning of the area that is taking on the name of "SoBro". Broad Ripple Proper picks up around 54th-57th Streets and Broad Ripple Village between Kessler Blvd and the mighty White River. North of the river you pass Marott Park and Nature Preserve until you cross 75th Street where you'll see the Indiana Blind School to the West. This begins a slight increase in the grade of the trail and the approach to the Nora area.
Accessibility Information
No text provided.
Allowed Uses:
Bicycling Hiking/Walking Snow, cross-country skiingOther Activities
- Snow, snow play general
Public Contact
Terri VanZantIndy Parks, Greenways
900 E. 64th St.
Indianapolis, IN 46220
[email protected] • (317) 327-7421
www.indygreenways.org
Contact the trail manager for current maps and visiting details.
More Details
- Elevation (low): 724
- Elevation (high): 804
- Elevation (cumulative): --
- Part of a Trail System? No
- National Designations: Legacy Millennium
- State Designations: 2000 ASLA award for landscape architecture
- Surface (primary): Paved
- Surfaces (additional): Rock, crushed
- Tread Width (average): 96"
- Tread Width (minimum): --
- Running length (minimum): --
- Tread Grade (average, percent): 2
- Tread Grade (maximum): 5
- Running length (maximum): --
- Cross-slope (average, percent): --
- Cross-slope (maximum): --
- Running length (maximum): --
- Certified as an NRT
May 31, 2002